无标题文档
 
      中文首页 | English  
  About us Products Customer service Technology News center Career  
  Business
  Sales
  Our culture
  Company organization
  Key projects in the past 10 years
  Memorabilia for each year
 
 
  About us - Memorabilia for each year
 
Memorabilia from 1994 to 2004
 1994
April
  • Beijing Hathaway Sifang Automation Co.,Ltd was founded
  • May
  • Professor Yang Qixun was awarded as Elite in China’s Power Industry by Electrical Power Ministry
  • September
  • CSL200A series and CSL160A series digital line protection devices, CST200A series digital transformer protection device, CSC2000 distributed substation automation system all passed the Ministry level assessment for its advanced technologies worldwide.
  • October
  • Professor Yang Qixun was elected as academician of Chinese Engineering Academy
  • 1996
    November
  • CSL101(2)A220KV-500KV digital line protection device passed the Ministry level assessment for their advanced technologies worldwide.
  • 1997
    May
  • Nanping substation in Zhuhai, the first layered distributed integrated automation of 220KV in China, was put into operation successfully. It is based on CSC2000 substation integrated automation system.
  • December
  • Hathaway-Sifang obtained the qualification of ISO9001, the international quality standard.
  • 1998
    November
  • Hathaway-Sifang Research Institute was founded jointly by Sifang and North China Electric Power University.
  • 1999
    December
  • CST100B series digital transformer protection device, CSG300A digital large generator-transformer protection device
  • CST30A series digital transformer differential protection passed the Ministry level assessment for their advanced technologies worldwide.
  • 2000
    June
  • CSL103 digital optical fiber longitudinal differential protection device passed the assessment of the State Power Company for its advanced technologies worldwide.
  • CSC2000 distributed substation automation was listed among State Key Products and awarded the certificate.
  • August
  • Hathaway-Sifang was listed among the Top 1000 High-Tech Enterprises in China and its per capita output was listed among the top 200 in China.
  • September
  • Nanchang substation, the first substation of 500KV for electric power output in the Three Gorge Project, was put into operation successfully. It is based on CSC2000 substation integratd automation system.
  • October
  • Xinxing substation in Dandong, the first 220KV substation which all its secondary equipments were installed in switchyard, was put into operation successfully. It is based on CSC2000 substation integrated automation system.
  • November
  • Hathaway-Sifang was listed among the Top 20 Powers in Haidian Science Park, Zhongguancun in year 1999.
  • December
  • ERP was put into practice which leads to a enterprise management improvement.
  • 2001
    June
  • Beijing Hathaway Sifang Automation Co.,Ltd was renamed as Beijing Sifang Automation Co.,Ltd.
  • November
  • Contract signing ceremony for protection relay and fault information management system between State Power Dispatching and Communication Center and Sifang was held in Beijing.
  • December
  • Signing ceremony for the founding of the Tsinghua- Sifang Power System Stability Control Research Institute was held in Sifang Building. Academician Yang Qixun from Sifang is the director; Academician Han Yingduo from Tshinghuais the vice director and head of the institute.
  • CSL101 series digital line protection device developed by Sifang was awarded Beijing Science and Technoloy Progress Prize of year 2000 by Beijing municipal government.
  • 2002
    March
  • Sifang was assessed as Key Software Supplier of Beijing.
  • April
  • Sifang first in China implemented long distance information transmission from Jingmen 500KV substation to State Power Dispatching Center through state power data net(SPDNET) comply with protocol IEC60870.
  • June
  • Among all the key transmission& transformation projects carried out Sifang, ten substations in 500KV were finished.
  • November
  • Sifang was listed among the Top 20 Powers in Haidian Science Park, Zhongguancun in year 1999
    Sifang finished its re-allocation of shareholder.
  • 2003
    March
  • CSC2000 distributed substation automation system was awarded the 2nd Prize of National Science& Technology Progress.
    Sifang was listed among the top 200 powers of China’s electric industry of year 2001
  • April
  • Sifang was listed among the top 100 powers of China’s enterprises owning independent intellectual property of year 2002
  • May
  • General manager Wang Xuzhao prsented an interview in Economy Half Hour Channel of CCTV on behalf of all the staff to present the belief of victory against SARS and confidence on company development.
  • August
  • CSI200E digital integrated measurement-control device was honored as New National Key Product.
  • Signing ceremony of real time dynamic monitoring & control system of the Three Gorges Project, a bidding project from State Power Dispatching Center , was held in Beijing. Sifang won the bidding for its advanced technologies, excellent service and high qualified product.
  • September
  • Sifang was listed among the top 100 powers of China’s software supplier in year 2003 by Ministry of IT Industry
    Sifang was honored as first class Credit Company by Beijing Local Taxation Bureau.
  • November
  • Sifang was awarded the 1st prize of Beijing Enterprise Management Innovation.
  • December
  • Sifang was awarded the 2nd prize of National Enterprise Management Innovation.
  • Sifang was honored as Key Software Supplier within State Program.
  • Sifang was listed among the Top 20 Powers in Haidian Science Park, Zhongguancun in year 2002.
  • 2004
    January
  • Sifang finished its transformation share reallocation
    China Electricity Council initiated evaluation conference in Beijing for Sifang ’s new generation products including CSS-100BE digital security & stability control system, CSI-200E integrated measure control device, CSL200E, CSP-200E, CST-300E digital low voltage protection measure control devce, CSSS-2000 substation simulation training system, CSSP-2000 thermal power generating units simulation system. They are highly praised as advanced products worldwide.
  • February
  • China Electricity Council initiated evaluation conference in Beijing for Sifang ’s new generation products including CSC101A HV line longitudinal distance protection device, CSC102A line longitudinal direction protection device, CSC103 HV line optical fiber longitudinal differential protection device, CSC120 enclosure & circuit breaker auxiliary protection device, CSC160 digital line protection device, CSC326 digital transformer protection device. They are highly appraised as advanced products worldwide.
  • 无标题文档

    All rights reserved Beijing Sifang Automation Co.,Ltd
    Address:Building 9,Fourth Avenue,Shangdi Information Industry Base,Haidian District, Beijing
    Zip:100085 Tel:+8610-62961515 Fax:+8610-62981004 Email:webinfo@sf-auto.com
    International Business Department : Tel +8610 62961515 Ext 8675 Mobile:+86 13910255729
    Email: liuminchuan@sf-auto.com or csc2000@126.com Fax:+8610 62981004