①Power module and AC module are configured to be redundant. Two collection systems are independent and reliable.
②Automatically identify the grid connection of the parallel point breaker.
③Capture the first zero phase angle difference with the precise mathematical model in case of frequency difference grid connection and realize quick grid connection without impact.
④Record closing time of the breaker, provide basic data to user and send alert when the phase difference between the actual measurement value and setting is higher.
⑤Connect T second phase, phase to phase voltage and set the rotary angle via the software.
⑥Prevent against the reverse power grid connection and no power phase change on demand.
⑦Provide overvoltage protection of the generator system.
⑧Receive the input block, output block and coordinate with other devices.
⑨Provide powerful wave recording function and store 40 grid merging records.
⑩Provide diversified communication interface (RS485 and electrical and optical Ethernet network) and support multiple protocols and dual network communication.